What is production scheduling?
Production scheduling decides which waiting job a machine should process next. Jobs compete for limited capacity, so one decision can change waiting times throughout the line.
NpSolv simulates jobs moving through a directed machine network and compares the dispatch policies you select. It is useful for exploring manufacturing cells, assembly lines, picking stations, and conveyor-connected workflows.
Build the machine network
Add machines and connect them in the directions jobs can travel from Source to Sink. Click a machine to edit its settings. Dragging a node changes the diagram, not processing time or travel distance.
Processing time and variation
Choose Per unit when time depends on the contents of a job, or Per job when a station handles the whole container once. A conveyor is typically Per job.
Enter a mean time and variation in seconds. A mean of 5 and variation of 2 samples uniformly between 3 and 7 seconds. Variation is a plus-or-minus range, not statistical variance. Zero variation gives a fixed duration. For Per unit machines, the sampled time is multiplied by the job's work units.
Servers and queue capacity
Servers determine how many jobs can process simultaneously. Queue capacity sets additional waiting places. A machine with one server and zero waiting places can hold one job. A finished job may hold its place until downstream capacity is available.
Connections and precedence
Edges define allowed movement, not probabilities or travel times. Model timed movement with a Per job machine such as a conveyor. Jobs use a shortest feasible route that includes their required operations. Add a precedence rule when one required machine must process before another.
Enter the jobs and work units
Each row describes a job. Quantity creates copies with the same requirements. Check a Per unit machine when that job requires processing there, then enter work units per copy. Four units at a mean of 2 seconds per unit takes about 8 seconds.
Unchecked machines are not required processing steps, although a route may pass through them. Per job machines are omitted from this table and handle jobs when their routes visit them.
| Field | Meaning |
|---|---|
| Release | Earliest availability in seconds from simulation start. Use 0 for jobs available immediately. |
| Due time | Target completion time from simulation start, not a duration after release or a guaranteed deadline. |
| Priority | Lower numbers take precedence under Priority first. Running work is not interrupted. |
Worked example: a small furniture production line
The solver opens with Bookshelf, Desk, and Side table jobs. Source feeds Conveyor 0, which connects to Pick A and Pick B. Jobs return to that shared conveyor before moving downstream.
The rest of the line follows Cutting, Conveyor 1, Drilling, Conveyor 2, Assembly, Conveyor 3, Packing, and Sink. Each job has different work requirements. The Side table requires Pick A, while Bookshelf and Desk require both picking stations.
- Open the solver and inspect the default network and machine settings.
- Review the jobs table. Work units are per job copy, not totals across Quantity.
- Select the candidate policies and run the solver.
- Compare waiting time and completion metrics, then inspect the Gantt.
- Try adding a server at a busy station and solve again to compare the effect.
Start with the included production line, then adjust it to match your operation.
Compare dispatch policies
A dispatch policy chooses among jobs ready for a machine. FIFO favors earlier arrivals, Priority first uses the job priority, and Shortest processing time favors a shorter next operation. Other options consider deadlines or remaining work.
Choose the policies to compare under Solver params. When times vary, Simulation runs repeats each policy across sampled scenarios. The same scenario is used for every policy within a run to make comparisons fair. A fixed random seed helps reproduce the sampling.
All jobs with Release 0 are available at the start. The resulting start sequence emerges from routing, capacity, and dispatch decisions rather than a separately entered release order.
Read the schedule results
The summary and policy comparison report average flow time, waiting time, and makespan across simulation runs. Makespan is the time at which the last job finishes. These metrics describe different tradeoffs, so inspect more than one.
The Gantt shows one representative run, not an averaged schedule. Each machine has one strip. Concurrent jobs appear as colored stripes within it. Hover to read time, zoom to inspect short operations, or expand the chart. Gray dashed portions indicate blocking.
Job start sequence groups jobs by their first machine start. Machine utilization and schedule details help identify busy stations and trace individual operations. Use Share to download a PDF with the schedule and reproduction inputs.
What should you check before using a schedule?
This tool compares simulated dispatch policies. It does not prove a globally optimal schedule or guarantee real-world deadlines. Results depend on your network, capacities, processing times, job data, and selected policies.
Processing variability uses a uniform range. Model requirements not exposed in the interface, such as shift calendars, breakdowns, sequence-dependent setups, or operator qualifications, separately before relying on the schedule.
Full machines can block one another in a cyclic network. The simulation can resolve transfer cycles by exchanging finished jobs. Check that such exchanges are physically possible in your operation.
Frequently asked questions
Why are conveyors missing from the jobs table?
The table shows Per unit machines that need job-specific work units. Per job machines process each visiting container once without a quantity entry.
Does moving a node change travel time?
No. Positions only arrange the diagram. Use a machine's processing time to model handling or conveyor travel.
Do jobs have to visit every machine?
No. Routes must include each required operation, but other machines are visited only when the network route passes through them.
Does the solver run locally?
The scheduling simulation runs in a browser worker so the interface can remain responsive while policies are evaluated.